Quality checks and non-conformance reports
Raise and record checks, handle failures with a non-conformance report, and approve a deviation.
Required permission: manufacturing.quality.view, manufacturing.quality.record, manufacturing.quality.approve
Before you begin
- The Quality checks and non-conformance switch is on and the production profile has Quality enabled.
- Quality templates exist in Manufacturing > Configuration > Quality Templates (also reachable from Manufacturing > Quality > Inspection Plans). A template has a Check point (Incoming, Before operation, During operation, After operation, Final), optional product or product category, and a table of checks with specification and limits.
- Recording results needs manufacturing.quality.record. Closing an NCR or approving a deviation needs manufacturing.quality.approve.
Steps
Get checks onto an order
- At release, final-point templates for the product are raised on the order, and an operation's quality plan is raised on that work order.
- To add one by hand, use the order's Quality tab: choose From template, or type a Check name, Type (Pass / fail, Measure, Text), Specification, Lower limit and Upper limit, UOM, Operation, and whether it Blocks completion.
Record a result
- Go to Manufacturing > Quality > Quality Checks and open a check on the Pending tab.
- For a Measure check enter the Measured value and choose From the measurement. Inside the limits it passes; outside it fails.
- Otherwise choose the Result: Pass, Fail, Conditional pass, Hold, Rework, Scrap or Deviation approval.
- Enter Qty failed if relevant. With Rework and a quantity, a rework request is raised.
- Tick Raise a non-conformance to open an NCR when the result is Fail.
- Add Notes and save.
Approve a deviation
- A different person with manufacturing.quality.approve opens a failed or held check.
- Choose Deviation approval and add a note, for example "Customer accepted".
- The check shows Deviation approved and no longer blocks completion.
Work a non-conformance report
- Go to Manufacturing > Quality > Non-Conformance and click New NCR.
- Describe the Issue (required). Set Type, Severity (Minor, Major, Critical), product, supplier, machine, operator, quantity, Owner and Due date.
- Click Investigate, then Action as the work progresses. Statuses run Open, Investigating, Corrective action, Closed.
- Enter the Root cause and Corrective action.
- Click Close. Only someone with manufacturing.quality.approve can close or reopen.
What happens next
- Checks you cannot ignore (Blocks completion) stop their work order, and the order's Complete Production, while Pending, Failed or on Hold, if Quality checks must pass to complete is on.
- An NCR linked to an order stops that order from being closed until the NCR is closed.
- Overdue NCRs show their due date in red.
- Manufacturing > Quality > Quality Reports shows pass rate per product and check point.
Example: a table's height must be between 74.5 and 75.5 cm. Measuring 75.2 passes. Measuring 76.0 fails. Choosing Pass for 76 is refused: '76 is outside 74.5 - 75.5; it cannot pass.'
Good to know
- Segregation of duties. 'The inspector who failed the check does not approve its deviation.' Deviation is only for a failed or held check: 'A deviation is approved for a failed or held check.' After it, 'This check was closed by a deviation.'
- 'Enter the measured value.' when a Measure check is recorded From the measurement with no value.
- Closing an NCR without a root cause and action: 'Record the root cause and the corrective action before closing.' A closed report is not edited: 'A closed report is not changed.'
- When creating an NCR, the Order box expects the order's internal id, not the MO number. Leave it empty if unsure; a typed MO number does not link the NCR to the order.
- Turning the Quality switch off hides the menus and refuses new results and NCRs; existing checks remain readable.