Build and approve a bill of quantities
Enter or import BOQ lines in a section and item hierarchy, approve the version and revise it without losing certified quantities.
Before you begin
The Bill of quantities feature must be on (Administration > Applications > Project Management > Features) and the project's feature profile must include BOQ. You need project.boq.edit to enter lines. Approving a BOQ needs project.budget.approve.
Steps: enter lines by hand
- Open Projects > Planning > BOQ and choose the project, or the BOQ tab on Project 360.
- Create a version with New version. Choose the Kind (tender, contract, internal, revised, variation or subcontract), a Name, and optionally Copy lines from another BOQ of this project.
- Add lines. Each line has a Code, a Level (Section, Subsection or Item) and a Description.
- For items, enter the Unit, Qty, Rate, Cost rate, Tax % and Retention %.
- Press Save lines.
An item belongs to the nearest subsection or section above it. Sections show the sum of their items.
Worked example
Section A "Substructure". Item A.1 Excavation, 500 m3 at AED 25, cost 18. Item A.2 Blockwork, 500 m2 at AED 120, cost 90, tax 5%. The items are 12,500 and 60,000; the section shows 72,500. The estimated cost is 54,000 and the margin 18,500. Tax is 5% of the items, 3,625.
Steps: import from a file
- On the BOQ tab press AI BOQ import and choose a CSV or TSV file of up to 5 MB.
- The preview lists the columns it recognised (for example Item No as code, Unit as uom), the number of sections and items and the total. A row with no quantity, rate or amount becomes a section. If the rate is missing, it is derived from amount divided by quantity.
- Press Use these lines, check the grid, then press Save lines. Nothing is saved until you do.
An empty file is refused: 'The file has no rows.' A file over 5 MB is refused: 'The file is larger than 5 MB.'
Steps: approve and revise
- When the lines are right, press Approve. The approver needs project.budget.approve.
- An approved BOQ is never edited: 'An approved BOQ is never edited; make a revised version.' Press New version, kind Revised, to copy its lines and certified quantities.
- Approving the revised version supersedes the older approved one of the same kind.
What happens next
- Certified qty and Progress % fill in as BOQ progress claims are certified. See Bill the customer and certify progress claims.
- A BOQ claim needs an approved contract or revised BOQ: 'Approve a contract BOQ before a BOQ claim.'
- Cost rate, estimated cost and margin are hidden from people without cost and margin permissions. Selling rate, amount, certified quantity and progress stay visible to them.
Good to know
- Certified quantities are carried by line code when you save lines again, so keep codes stable.
- If the Bill of quantities feature is off, saving shows 'Bill of quantities is disabled for this company.' You can still read existing BOQs.