Projects > ProjectsAll Projects > title menuAll Projects > Calendar viewAll Projects > Create ProjectAll Projects > ImportAll Projects > open a projectProject 360 > OverviewProject 360 > Edit ProjectProject 360 > ActionsProjects > PlanningTasks > New Task / open a taskProjects > ExecutionConfiguration > Project TypesConfiguration > Project Templates; ProjectsConfiguration > Feature ProfilesConfiguration > Cost CodesConfiguration > Billing Methods / Project Statuses / Milestone Types / Resource Types / Document Types / Expense Types / Risk Categories / Commercial TagsConfiguration > Approval RulesConfiguration > ResourcesConfiguration > Estimation LibraryConfiguration > AssembliesConfiguration > Project Settings (also the cog on All Projects)Administration > ApplicationsBOQ > AI BOQ importProject 360 > ResourcesCosts > TimesheetsProject 360 > CostsProjects > CommercialProcurement > Purchase requestProcurement > Material plan

Projects > Projects

All Projects (portfolio)

What it is for
Every live project of the company as cards, a list or a calendar, with the portfolio KPI row
List: columns and filters
KPI tiles: Total Projects, Active (In Progress), Completed (this year), On Hold, At Risk (+ delayed), Total Contract Value (Billed %, Margin %). Status tabs with counts: All, Active (= active + approved + at risk), Planning, On Hold, At Risk, Completed, Cancelled. Search (name/code, debounced), Project Type, Customer, Project Manager; More Filters: Billing method, Starts from, Ends by, Clear filters. Sort: Last Updated, Project Name, Start Date, End Date, Contract Value, Progress. Card / List / Calendar view (remembered per browser). 20 per page, Load more (n / total)
Buttons and actions
Import, Export (CSV of the loaded rows), Project settings (cog), Create Project, Create Project menu (8 templates + Manage templates...); card menu: Open, Edit, Favorite, Duplicate, Change Status, Archive/Restore, Export, Create Task, Log Time, Add Expense, Create Purchase Request, Create Change Order, Create Invoice, Upload Document
Permission needed
project.view (list); project.create (create, duplicate, import); project.edit (status, archive)

My Projects

What it is for
Projects I manage, created, or am a team member of
List: columns and filters
Same as All Projects with mine=true
Buttons and actions
Same as All Projects
Permission needed
project.view

Project Portfolio

What it is for
Totals grouped by Status, Project manager, Customer, Project type, Region (last part of the location) or Profitability band
List: columns and filters
Group, Projects, Contract value, Budget, Forecast cost, Invoiced, Forecast profit, At risk, Delayed, Over budget; Portfolio resource load heatmap below
Buttons and actions
Group by selector
Permission needed
project.view; Budget / Forecast cost need project.cost.view, Forecast profit needs project.margin.view

All Projects > title menu

Favourite / Archived Projects

What it is for
Projects I starred; projects archived (archived ones never show in All Projects)
List: columns and filters
Same columns; archived=true or favorites=true
Buttons and actions
Restore (from archive) on the card menu
Permission needed
project.view; archive/restore project.edit

All Projects > Calendar view

Portfolio calendar

What it is for
Month grid: project starts (blue), ends (dark) and milestones (violet) of non-archived projects
List: columns and filters
Previous / Next month, Today; weeks start Monday
Buttons and actions
Click an item to open the project
Permission needed
project.view

All Projects > Create Project

Create Project dialog

What it is for
A new project from a template (phases, tasks, milestones, billing plan, draft budget, documents) or blank
List: columns and filters
Form fields only
Buttons and actions
Cancel, Create Project; opens Project 360 when created
Permission needed
project.create

All Projects > Import

Import projects dialog

What it is for
CSV with header row name, code, start_date, end_date, contract_value, manager, location, description - one project per row through the same create API
List: columns and filters
Rows ready count; result log per row ('created' or the server message)
Buttons and actions
Cancel, Import (n), Done
Permission needed
project.create

All Projects > open a project

Project 360

What it is for
One project: header (image, status, favourite star, code, type and billing tags, overall progress, start -> expected finish, days remaining/overdue), eight KPI cards and the tabs allowed by its feature profile
List: columns and filters
KPI: Contract Value, Approved Budget, Actual Cost (% of budget), Committed Cost, Forecast Cost, Invoiced (% of contract), Collected (outstanding), Profit Margin (forecast profit). Tabs: Overview, Tasks, Gantt, Budget, BOQ, Resources, Procurement, Costs, Billing, Changes, Documents, Risks, Issues, Reports (Risks/Issues/Changes tabs show open counts). Link /projects/all/<id>?tab=<tab> opens it directly
Buttons and actions
Documents (DMS), Share (copies link), Print, Actions: change status (allowed next statuses), Close checklist, Duplicate, Save schedule baseline, Archive / Restore, Export (header CSV), Project reports; Edit Project; Collapse / Expand header (remembered)
Permission needed
project.view; cost figures project.cost.view; margin/profit project.margin.view

Project 360 > Overview

Overview tab

What it is for
Health strip and alerts with evidence, Project Information, compact Gantt, team with availability, milestones, top 6 open tasks, recent activity, quick actions
List: columns and filters
Health: Schedule, Budget, Forecast, Billing, Collection, Open Risks, Changes. Alerts: tasks overdue, milestones due in 14 days, budget exceeded, burn rate, low margin (<5%), unbilled progress (>15% of contract), changes awaiting customer, high risks (P x I >= 15)
Buttons and actions
Edit, Open Gantt, Manage (team -> Resources), Add Team Member, View all (milestones / tasks), Note (+), Quick Actions (filtered by feature)
Permission needed
project.view; Add Team Member / Note need project.edit

Add Team Member and Add to activity dialogs

What it is for
Add an employee or external person to the project team; log a note or a meeting on the activity feed
List: columns and filters
Form fields only
Buttons and actions
Cancel, Add / Save
Permission needed
project.edit

Project 360 > Edit Project

Edit Project dialog

What it is for
Change the project's header and commercial terms
List: columns and filters
Form fields only; fields set Hidden in Applications > Project Management > Fields disappear (shown locked if they hold a value)
Buttons and actions
Cancel, Save (with revision check)
Permission needed
project.edit

Project 360 > Actions

Project close checklist

What it is for
Eleven items ticked before a project can be Closed; beside each, what the data says
List: columns and filters
Tasks complete (n open), Milestones complete (n open), Billing complete (n steps not invoiced), Costs posted, POs closed (n requests open), Subcontracts closed (n open), Retention handled (retention held), Assets returned, Documents complete, Customer sign-off, Final P&L reviewed (margin %)
Buttons and actions
Cancel, Save checklist
Permission needed
project.view to read; project.close to save

Projects > Planning

Tasks > Phases / WBS

What it is for
Phases with dates and progress rolled up from their tasks; the work breakdown list
List: columns and filters
Code, Phase (editable inline), Start, Finish, Progress, Status; new phase row (code + name); Work breakdown list (read-only)
Buttons and actions
Add phase (+ / Enter), rename on leaving the cell, Delete phase
Permission needed
project.task.view; changes project.task.edit

Tasks (list and Kanban)

What it is for
All tasks of the project grouped by phase; Kanban by status (drag a card to move it); the Tasks menu lists open tasks of every project
List: columns and filters
Code, Task (flag for milestone task), Assignee, Start, Finish (red when overdue), Days, Progress, Status, Priority, Hours (actual / planned), Float (dot = critical). Filters: search, status (All, Open, each status). Critical tasks highlighted
Buttons and actions
New Task, open a task, drag between Kanban columns; sub-tabs Task list, Kanban, Milestones, Phases / WBS, Daily progress
Permission needed
project.task.view; changes project.task.edit

Gantt schedule

What it is for
Phases and tasks on a time scale with FS/SS/FF/SF links and lag, critical path from the server, approved baseline beside the bars, baselines and variance
List: columns and filters
Show baseline, Critical path only; 'Critical path finishes <date>' (red note when after the planned finish); Dependencies table; Baselines table (#, Name, Kind, State, Tasks); Baseline variance (start / finish / progress variance)
Buttons and actions
Link (add dependency), remove link, Save baseline, Approve (draft baseline)
Permission needed
project.task.view; links / save baseline project.task.edit; approve project.budget.approve

Milestones

What it is for
Contract, billing, approval and handover milestones; completing a billing milestone makes its billing step ready
List: columns and filters
Milestone, Type, Due Date, Status (pending past due shows Delayed), Billing %, Completed
Buttons and actions
Add Milestone, open to edit, Delete
Permission needed
project.view; changes project.task.edit

Budget

What it is for
Budget vs actual by cost code, budget versions (draft -> submitted -> approved -> frozen / revised) and budget changes
List: columns and filters
Budget vs Actual grid: Cost code, Description, Original Budget, Approved Changes, Current Budget, Committed, Actual, Forecast Remaining, Forecast Final, Variance + totals. Budget versions: version picker (#, name, state, total) and editable lines. Budget changes: Number, Kind, Cost code, To, Amount, Reason, State, Raised
Buttons and actions
Save lines, Submit for approval, Approve, Reject, Freeze, New revision, From estimate, Budget change, Approve / Reject a change
Permission needed
project.budget.view; prepare project.budget.edit; approve / freeze project.budget.approve

Estimation

What it is for
Estimate revisions with category lines, assemblies, waste, productivity and markup; an approved estimate can seed a budget
List: columns and filters
Estimate picker (number, name, state); lines grid; Summary by category (Cost, Price) and Margin %
Buttons and actions
Expand assemblies, Save lines, Submit, Approve, Reject, New estimate / Copy as new estimate
Permission needed
project.budget.view; edit project.budget.edit; approve project.budget.approve

Bill of quantities

What it is for
BOQ versions by kind (tender, contract, internal, revised, variation, subcontract) with section / subsection / item hierarchy, selling and cost rates, certified progress
List: columns and filters
KPI: BOQ value, Estimated cost, Margin, Certified, Progress. Grid: Code, Level, Description, Unit, Qty, Rate, Cost rate, Tax %, Retention %, Certified qty, Progress %, Amount
Buttons and actions
AI BOQ import (CSV), Save lines, Approve, New version
Permission needed
project.boq.view; edit project.boq.edit; approve project.budget.approve; switch 'Bill of quantities'

Resource Planning (portfolio heatmap)

What it is for
Weekly load of every pool resource across projects against capacity, with leave from HR
List: columns and filters
Resource rows x weeks (6/12/26/52) from a chosen Monday; cell = load %; colours Free, Partial (<80), Full (80-100), Over (>100), Leave (5 days); tooltip hours and projects
Buttons and actions
From date, Weeks
Permission needed
project.resource.view

Tasks > New Task / open a task

Task dialog

What it is for
Create, edit or delete one task
List: columns and filters
Form fields; actual hours, actual cost and baseline finish shown on an existing task
Buttons and actions
Delete, Cancel, Save
Permission needed
project.task.edit

Projects > Execution

Daily progress

What it is for
Quantity progress for tasks that have a planned quantity
List: columns and filters
Task, Unit, Planned, Previous, Today, Cumulative, Balance, Progress; Recent entries (last 100)
Buttons and actions
Record (task, date, quantity, note)
Permission needed
project.task.view; Record project.task.edit

Timesheets

What it is for
Time entries with their approval flow; the Execution page lists every project's time (filter by state)
List: columns and filters
Date, Project (cross list), Person, Task, Description, Hours, Billable, Cost, Value, State; totals Hours, Billable, Cost, Value; state filter
Buttons and actions
Log Time (project tab), Submit, Approve, Reject, Post, Back to draft, tick submitted rows + Approve selected
Permission needed
project.view; log project.task.edit; approve project.resource.assign

Expenses

What it is for
Project expenses with the same approval flow as time
List: columns and filters
Date, Project (cross), Kind, Description, Vendor, Paid by, Amount, Billable, State; Total and per kind
Buttons and actions
Add Expense, Submit, Approve, Reject, Post, Back to draft
Permission needed
project.view; add project.task.edit; approve project.budget.approve

Configuration > Project Types

Project Types

What it is for
The 24 built-in types (Service ... Custom) and the company's own; a type gives the default profile and billing method
List: columns and filters
Code, Name, Feature profile, Default billing method, Colour, Active; search; Kanban off
Buttons and actions
New, open, Save, Delete (built-in: refused; others are switched off)
Permission needed
project.configure (server); menu shows for project.view

Configuration > Project Templates; Projects

Project Templates

What it is for
Eight built-in templates (Small Service, Consulting, Software, Installation, Maintenance, Internal, Construction, Engineering) and own ones
List: columns and filters
Code, Name, Type, Feature profile, Billing method, Active (Description and Definition JSON on the form)
Buttons and actions
New, open, Save, Delete
Permission needed
project.configure

Configuration > Feature Profiles

Feature Profiles

What it is for
Which tabs and functions a project shows: Light, Enterprise, Construction / Engineering and own
List: columns and filters
Code, Name, Enabled features (29 choices), Active
Buttons and actions
New, open, Save, Delete
Permission needed
project.configure

Configuration > Cost Codes

Cost Codes

What it is for
Cost codes 01 Labor ... 07 Other and own; the GL account prefix maps ledger cost to a code
List: columns and filters
Code, Name, Category, Parent, GL account prefix, Active
Buttons and actions
New, open, Save, Delete (switch off)
Permission needed
project.configure

Configuration > Billing Methods / Project Statuses / Milestone Types / Resource Types / Document Types / Expense Types / Risk Categories / Commercial Tags

Lookup lists (8 menus)

What it is for
Simple code lists used on forms (stages are 'Project Statuses' in the menu, 'Project stages' on the page)
List: columns and filters
Code, Name, Order, Colour (statuses only), Active
Buttons and actions
New, open, Save, Delete (switch off)
Permission needed
project.configure

Configuration > Approval Rules

Approval Rules

What it is for
Rules naming which permission approves a subject from an amount
List: columns and filters
Applies to, Name, From amount, Approver permission, Active
Buttons and actions
New, open, Save, Delete
Permission needed
project.configure

Configuration > Resources

Resources

What it is for
The resource pool (people, contractors, teams, equipment, vehicles, rooms) with capacity and rates
List: columns and filters
Name, Type, Employee, Capacity (hours/day), Cost rate / hour, Bill rate / hour, Active
Buttons and actions
New, open, Save, Delete (switch off)
Permission needed
list project.view; changes project.configure

Configuration > Estimation Library

Estimation Library

What it is for
Rates for materials, labour, equipment, subcontract, crews, productivity, activities
List: columns and filters
Kind, Code, Name, UOM, Rate, Productivity (units/hour), Cost code, Active
Buttons and actions
New, open, Save, Delete
Permission needed
project.configure

Configuration > Assemblies

Assemblies

What it is for
A unit of work made of components (e.g. 1 m3 concrete = cement + sand + labour) expanded on an estimate
List: columns and filters
Code, Name, UOM, Waste %, Active (Components on the form)
Buttons and actions
New, open, Save, Delete
Permission needed
project.configure

Configuration > Project Settings (also the cog on All Projects)

Project Settings

What it is for
Company defaults: code prefix, recognition method, overhead, retention, hours, switches and the 12 project journal accounts
List: columns and filters
Form; each account shows 'Automatic (<code>)' when left empty
Buttons and actions
Save
Permission needed
view project.view; Save project.configure

Administration > Applications

Project Management features

What it is for
Switches: Bill of quantities, Subcontracts and claims, Change orders, Project procurement, Baselines and earned value, Project revenue recognition (Projects, tasks and Gantt is always on)
List: columns and filters
Switch list with help text
Buttons and actions
Switch on / off, Save
Permission needed
company administrator

Project Management fields

What it is for
Customer PO, Contract number (Hidden / Optional / Read-only / Required), Project location, Project description (Hidden / Optional / Required)
List: columns and filters
Field, Record, Mode
Buttons and actions
Choose mode, Save
Permission needed
company administrator

BOQ > AI BOQ import

AI BOQ import - preview

What it is for
Columns detected in a CSV/TSV, sections and items found, total, first 60 lines
List: columns and filters
Detected columns (code <- 'Item No' ...), n sections, n items, total
Buttons and actions
Cancel, Use these lines (then Save lines)
Permission needed
project.boq.edit

Project 360 > Resources

Resources tab

What it is for
The project team, resource assignments and this project's resource load
List: columns and filters
Project team: Name, Employee, Role, Allocation %, From, To, Cost rate, Bill rate. Assignments: Resource, Task, From, To, Allocation %, Hours, Cost rate, Bill rate. Resource load heatmap
Buttons and actions
New, open, Save, Delete (team / assignment)
Permission needed
project.resource.view; changes project.edit

Costs > Timesheets

Log Time dialog

What it is for
One time entry for me or a team member
List: columns and filters
Form fields only
Buttons and actions
Cancel, Save
Permission needed
project.task.edit

Project 360 > Costs

Cost summary

What it is for
Actual cost from posted journals and documents on the project's analytic value plus approved time, expenses and certified subcontract claims
List: columns and filters
KPI: Actual cost, Committed, Hours, Vendor bills, Bills paid; By category bars, By cost code table, By month bars; Purchase orders on this project
Buttons and actions
Post approved time & expenses
Permission needed
project.cost.view (to read); post project.budget.edit

Forecast

What it is for
Budget, actual, committed, estimate to complete, estimate at completion and variance by cost code
List: columns and filters
KPI: Budget, Actual, Committed, ETC, EAC, VAC; grid with 'Revise ETC' input per cost code; Forecast history
Buttons and actions
Save forecast (with a reason)
Permission needed
project.cost.view; save project.budget.edit

Project P&L and revenue recognition

What it is for
P&L from ERP transactions with the project's recognition method; the recognition card posts unbilled revenue and the loss provision
List: columns and filters
Revenue (contract, variations, total, recognised, invoiced, unbilled), direct cost by category, gross profit, overhead, allocated, project profit; at completion forecast. Recognition KPIs: Recognised to date, Invoiced, Unbilled revenue (should be / in the ledger), Forecast loss, Loss provision; runs history
Buttons and actions
Recognise to (date), Post <amount>
Permission needed
project.margin.view (P&L, recognition); post project.billing.create; switch 'Project revenue recognition'

Earned value

What it is for
BAC, PV, EV, AC, CPI, SPI, CV, SV, EAC, ETC, VAC as of today
List: columns and filters
11 tiles; CPI / SPI under 1.00 red
Buttons and actions
-
Permission needed
project.cost.view

Cash flow

What it is for
Planned and actual revenue and cost, cash in and out by month
List: columns and filters
Bars (cash in / out) and table: Month, Planned revenue, Planned cost, Actual revenue, Actual cost, Cash in, Cash out, Net, Cumulative
Buttons and actions
-
Permission needed
project.cost.view

Projects > Commercial

Procurement

What it is for
Purchase requests to draft purchase orders, the material plan, subcontracts, and the orders and bills on the project
List: columns and filters
KPI: Requested, Ordered, Received / billed, Paid, Committed. Sub-tabs: Purchase requests (Number, Description, Kind, Vendor, Required, Estimated, State), Material plan, Subcontracts, Orders & bills. The menu page lists purchase orders of all projects (Project, Order, Vendor, Date, State, Net)
Buttons and actions
Purchase request, Edit, Submit, Approve, Reject, Choose vendor, Create Purchase Order
Permission needed
project.view; changes project.edit; approve project.budget.approve; switch 'Project procurement'

Purchase Requests (all projects)

What it is for
Every project's purchase requests; a row opens the project's Procurement tab
List: columns and filters
Project, Number, Description, Vendor, Required, Estimated, State; search
Buttons and actions
Open row
Permission needed
project.view

Commitments (all projects)

What it is for
Purchase orders and bills on every project plus active / completed subcontracts
List: columns and filters
Project, Number, Kind, Vendor, Date, State, Value; search
Buttons and actions
Open row
Permission needed
project.view; switch 'Project procurement'

Subcontracts

What it is for
Subcontracts and their claims: claimed -> reviewed -> verified -> certified (net of retention and advance recovery) -> billed (draft vendor bill) -> paid
List: columns and filters
Card per subcontract: value, retention %, certified (progress %), paid; claims table: Claim, Period, %, Claimed, Verified, Certified, Retention, Recovery, Net, State. Menu page: Project, Number, Subcontractor, Kind, Value, Status
Buttons and actions
Subcontract (new), Activate, New claim, reviewed / verified / certified / Raise vendor bill / paid, Post retention
Permission needed
project.view; changes project.edit; certify project.budget.approve; switch 'Subcontracts and claims'

Procurement > Purchase request

Purchase request dialog

What it is for
What is needed, from whom, by when, with priced lines
List: columns and filters
Lines: Description, Qty, Unit, Rate, Amount
Buttons and actions
Add a line, Cancel, Save
Permission needed
project.edit

Procurement > Material plan

Material plan

What it is for
Planned, reserved, purchased, received, issued, consumed and returned quantities per material
List: columns and filters
Material, Product, UOM, Task, Planned qty, Required date, Reserved, Purchased, Received, Issued, Consumed, Returned (balance = planned - consumed + returned on the procurement answer)
Buttons and actions
New, open, Save, Delete
Permission needed
project.view; changes project.edit