Create, approve, schedule and assign work orders
Create a job directly, approve it, set a planned time and give it to a technician.
Before you begin
- The asset must exist and must not be Decommissioned or Disposed. A job on such an asset is refused: 'That asset is no longer in service.'
- You need
maintenance.workorder.createto create. Approving needsmaintenance.request.approve. Scheduling and assigning needmaintenance.workorder.assign. - Technicians must be set up under Maintenance > Configuration > Technicians.
Create a work order
- Open Maintenance > Maintenance > Work Orders.
- Click New Work Order.
- Choose the Asset. Criticality, branch, cost centre, project and team are copied from the asset.
- Type the Issue, for example
Replace condenser fan motor. - Choose the Maintenance Type. Corrective, Emergency and Breakdown are repairs.
- Set the Priority. Urgent jobs also show under Operations > Breakdowns.
- Optionally choose Team and Technician, Planned Start, Planned Finish and Estimated Hours.
- Click Create.
The job gets a number (WO-00001 style) and status Draft. Most jobs come from approved requests; see Report an issue and handle requests. Preventive plans create theirs automatically.
Approve
- Open the work order.
- Click More > Approve. The status goes from Draft to Approved.
Approval is required only if the administrator ticked Work orders need approval before they are scheduled or started. With it on, a Draft job cannot be scheduled, assigned or started. The messages are 'Approve the work order before scheduling it.', '...before assigning it.' and '...before starting it.'
Schedule
- Click More > Schedule.
- Enter Planned Start (required) and Planned Finish.
- Confirm. The status becomes Scheduled and the job appears on Planning > Maintenance Calendar.
A planned finish before the start is refused: 'It cannot finish before it starts.' An open job whose planned finish has passed shows a red Overdue chip.
Assign
- Click Assign and choose the Technician (required).
- Confirm. The status becomes Assigned and the technician's user gets a bell notification.
If you reassign a job that is already running, the first technician's hours stop and are costed, and a new timer starts for the second technician.
Check the load before you assign
Open Maintenance > Planning > Workload, choose the start date, and read the Load % for each technician. It compares planned hours with 8 hours per working day over seven days. Over 100 % shows red. The weekend used is Friday and Saturday.
What happens next
The technician sees the job in My Work and starts it: Run a job as a technician. The job shows on the dashboard tiles and on the queue pills of the Work Orders list: Open, My Work, Overdue, Emergency, In Progress, Waiting Parts, Waiting Vendor, On Hold, Preventive, Corrective, Shutdown, Completed, Closed, All.
Good to know
- You can change the asset on a job only while it is Draft or Approved.
- Tasks are added on the Tasks tab with Add Task (task text, planned hours, optional technician).
- Some details, such as the vendor, contract, project, cost centre and meter, cannot be edited on the work order screen today. They are copied from the asset or the plan.
- To cancel, reopen or close a job, see Complete, close, reopen and cancel.